TigerTriple.com

Talk => General Discussions => Topic started by: KuzzinKenny on September 09, 2014, 02:12:47 AM

Title: WTF !!
Post by: KuzzinKenny on September 09, 2014, 02:12:47 AM
Just been readin stuff about this new bridge that's be'in built near me and i had to shake me head in disbelief as it read..................

"The arrival of four steel shipments from China last month signalled the next phase of construction which will see the laying of bridge decks. Each weighs 250 tonnes and will be attached to the central tower by late summer"

!!!!!!!!!!!!!CHINA !!!!!!!!!!!!!! cos Maggie an her crew shut all our steel works and that shut the fabricators and everythin else that went with it  :icon_evil:

i give up  :icon_sad:

KK

ps just incase anyones interested..........

http://www.transportscotland.gov.uk/road/forth-replacement-crossing/webcams

http://www.edinburghnews.scotsman.com/news/transport/milestone-reached-in-new-forth-crossing-build-1-3452497
EhPortal 1.34 © 2025, WebDev